A secure tiered, robust, and deterministic converged communications architecture with the capacity to support a plurality of power distribution automation devices/components with fiber-enabled fail-over protection is described.
Methods and systems for determining a hosting capacity in a distribution grid are disclosed herein. The methods and systems may use optimization models that consider operating conditions of a distribution grid having a distinct topology, characteristics, and predetermined performance parameters. The determination of a hosting capacity may first consider a lossless power flow model for the distribution grid, which may then be used to arrive at a maximum hosting capacity for the distribution grid. The maximum hosting capacity may be defined as the total capacity of a number of distributed generators connected to the distribution grid such that the performance parameters will be met.
H02J 3/38 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs
H02J 3/48 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs contrôlant la répartition de puissance entre les générateurs, convertisseurs ou transformateurs contrôlant la répartition de la composante en phase
H02J 3/50 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs contrôlant la répartition de puissance entre les générateurs, convertisseurs ou transformateurs contrôlant la répartition de la composante déphasée
Technologies are provided for reporting, monitoring, analyzing performance of distributed energy resources (DERs). The monitoring and analysis of a DER can be performed in real-time or essentially real-time. The monitoring also can include health monitoring of a DER. The reporting of performance of a DER is configurable. The monitoring and analysis of performance of the DER also is configurable. Attributes that control the reporting, monitoring, and analysis can be interactively configured via user interfaces having one multiple control elements. Performance of a DER can be reported, monitored, and analyzed irrespective of manufacturer of the DER.
H02J 3/14 - Circuits pour réseaux principaux ou de distribution, à courant alternatif pour règler la tension dans des réseaux à courant alternatif par changement d'une caractéristique de la charge du réseau par interruption, ou mise en circuit, des charges du réseau, p. ex. charge équilibrée progressivement
A template device having a plate and a pattern of openings defined within the plate. The plate has a first section, a second section, a third section, and first and second ends oppositely disposed. The first section includes the first end, the second section includes the second end, and the third section is positioned between the first and second sections. The pattern of openings corresponds to positioning of bolt holes within a bar of a bar-type current transformer assembly. The pattern of openings includes: a first plurality of openings positioned in the first section and configured to overlie holes defined within a first portion of the bar of the current transformer assembly; and a second plurality of openings positioned in the second section and configured to overlie holes defined within a second portion of the bar of the current transformer assembly.
An apparatus may include a controller and a relay device for measuring voltages associated with a battery and determining resistances associated with the battery that can be used to determine whether there is a battery ground associated with the battery. The relay device may comprise one or more switches that may be coupled to the battery for measuring the voltages. The relay device may be configured to implement an automated configuration sequence of one or more configurations of the one or more switches in order to the measure voltages. The controller may determine resistance values based on the measured voltages values. Based on comparing the resistance values to a threshold, one or more battery grounds of the battery may be determined and a notification may be output based on the detected one or more battery grounds.
G01R 31/3835 - Dispositions pour la surveillance de variables des batteries ou des accumulateurs, p. ex. état de charge ne faisant intervenir que des mesures de tension
G01R 31/389 - Mesure de l’impédance interne, de la conductance interne ou des variables similaires
Methods and systems for determining a hosting capacity in a distribution grid are disclosed herein. The methods and systems may use optimization models that consider operating conditions of a distribution grid having a distinct topology, characteristics, and predetermined performance parameters. The determination of a hosting capacity may first consider a lossless power flow model for the distribution grid, which may then be used to arrive at a maximum hosting capacity for the distribution grid. The maximum hosting capacity may be defined as the total capacity of a number of distributed generators connected to the distribution grid such that the performance parameters will be met.
H02J 3/00 - Circuits pour réseaux principaux ou de distribution, à courant alternatif
H02J 3/38 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs
H02J 3/48 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs contrôlant la répartition de puissance entre les générateurs, convertisseurs ou transformateurs contrôlant la répartition de la composante en phase
H02J 3/50 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs contrôlant la répartition de puissance entre les générateurs, convertisseurs ou transformateurs contrôlant la répartition de la composante déphasée
8.
METHODS AND SYSTEMS FOR ENHANCING ASSET RESOURCE RESILIENCY
Methods, systems, and apparatuses for predicting an estimate of a number of equipment outages affected by severe weather events. Resource data associated with weather data and equipment data may be used to train a predictive model. The predictive model may be trained to output a prediction indicative of a number of equipment outages associated with an area affected by a severe weather event.
G06N 5/022 - Ingénierie de la connaissanceAcquisition de la connaissance
G01W 1/06 - Instruments pour indiquer des conditions atmosphériques par mesure de plusieurs variables, p. ex. humidité, pression, température, nébulosité ou vitesse du vent donnant l'indication des conditions météorologiques par combinaison des variables mesurées
9.
METHODS AND SYSTEMS FOR A MOBILE SMART METER AND A SMART METER OUTLET
Methods, systems, and apparatuses are described for using a portable smart meter configured to connect an electric vehicle (EV) to an outlet at a service location associated with a service owner in order to charge or discharge a battery of the EV. The portable smart meter may be further configured to determine an amount of energy used to charge the battery of the EV, or the amount of energy discharged from the battery, via the outlet at the service location in order to bill an owner of the EV based on the amount of energy used to charge the battery instead of the service owner or credit the owner of the EV based on the amount of energy discharged from the battery.
Technologies are provided for circuit topology detection in an electric power circuit. In some embodiments, a computing device can access phasor data associated with the electric power circuit including an arrangement of switching devices and multiple phasor measurement units. The computing device also can access threshold data defining individualized zero-current threshold values for respective ones of the multiple phasor measurement units. The computing device can determine one or more zero-current branches present in the arrangement of switching devices by applying the individualized zero-current thresholds to the accessed phasor data. The computing device can further determine, based on the one or more zero-current branches a circuit topology corresponding to the arrangement of switching devices.
A secure tiered, robust, and deterministic converged communications architecture with the capacity to support a plurality of power distribution automation devices/components with fiber-enabled fail-over protection is described.
Technologies are provided for reporting, monitoring, analyzing performance of distributed energy resources (DERs). The monitoring and analysis of a DER can be performed in real-time or essentially real-time. The monitoring also can include health monitoring of a DER. The reporting of performance of a DER is configurable. The monitoring and analysis of performance of the DER also is configurable. Attributes that control the reporting, monitoring, and analysis can be interactively configured via user interfaces having one multiple control elements. Performance of a DER can be reported, monitored, and analyzed irrespective of manufacturer of the DER.
H02J 3/14 - Circuits pour réseaux principaux ou de distribution, à courant alternatif pour règler la tension dans des réseaux à courant alternatif par changement d'une caractéristique de la charge du réseau par interruption, ou mise en circuit, des charges du réseau, p. ex. charge équilibrée progressivement
H02J 3/38 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs
H02J 3/00 - Circuits pour réseaux principaux ou de distribution, à courant alternatif
H02J 3/16 - Circuits pour réseaux principaux ou de distribution, à courant alternatif pour règler la tension dans des réseaux à courant alternatif par changement d'une caractéristique de la charge du réseau par réglage de puissance réactive
14.
Passive optical network for utility infrastructure resiliency
A secure tiered, robust, and deterministic converged communications architecture with the capacity to support a plurality of power distribution automation devices/components with fiber-enabled fail-over protection is described.
A secure tiered, robust, and deterministic converged communications architecture with the capacity to support a plurality of power distribution automation devices/components with fiber-enabled fail-over protection is described.
Machine learning may be used to forecast an estimated time of restoration (ETR) during a service interruption. To forecast an ETR, the collection of information from the multiple sources may be provided as inputs to a machine learning model, such as a deep long-short term memory recurrent neural network, a predictive model, and/or the like. The machine learning model may be trained to optimize the temporal cost function of sustained service interruptions and forecast ETRs for service interruptions (in minutes). The machine learning model may process data/information in real-time and provide an ETR when inputs are not yet available in the repair/resolution process, and update (reforecast) the ETR in real-time as the inputs late become available.
A cover mountable over a sensor includes a hood and a baffle. The cover is adapted to create a barrier between the sensor and ambient light. The hood surrounds an interior volume for receiving the sensor. The baffle has a sidewall that surrounds an opening providing access to the volume.
Methods and systems are disclosed for determining active and/or reactive power flows in a distribution line of a distribution network. The determined power flows may be linear in nature, and they may further be used to determine an overall network power flow for the distribution network. Further, the network power flow can be used to determine a voltage magnitude for any distribution bus in the distribution network. The methods and systems are capable of considering a plurality of sensitivity factors that may affect one or more distribution buses.
H02J 13/00 - Circuits pour pourvoir à l'indication à distance des conditions d'un réseau, p. ex. un enregistrement instantané des conditions d'ouverture ou de fermeture de chaque sectionneur du réseauCircuits pour pourvoir à la commande à distance des moyens de commutation dans un réseau de distribution d'énergie, p. ex. mise en ou hors circuit de consommateurs de courant par l'utilisation de signaux d'impulsion codés transmis par le réseau
G05B 15/02 - Systèmes commandés par un calculateur électriques
G01R 19/00 - Dispositions pour procéder aux mesures de courant ou de tension ou pour en indiquer l'existence ou le signe
G01R 25/00 - Dispositions pour procéder aux mesures de l'angle de phase entre une tension et un courant ou entre des tensions ou des courants
G01R 19/25 - Dispositions pour procéder aux mesures de courant ou de tension ou pour en indiquer l'existence ou le signe utilisant une méthode de mesure numérique
19.
METHODS AND SYSTEMS FOR ASSESSING HOSTING CAPACITY IN A DISTRIBUTION SYSTEM
Methods and systems are described for determining a distribution system's hosting capacity for distributed power generation. Hosting capacity may be assessed on a feeder-by-feeder basis. Performing a hosting capacity assessment may include randomly selecting spot load points in a feeder as candidates for installation of distributed power generation sources. The hosting capacity assessment may be repeated a number of times to ensure optimal results and to correct for any violations of system performance parameters caused by an addition of distributed power generation at a given spot load point.
H02J 13/00 - Circuits pour pourvoir à l'indication à distance des conditions d'un réseau, p. ex. un enregistrement instantané des conditions d'ouverture ou de fermeture de chaque sectionneur du réseauCircuits pour pourvoir à la commande à distance des moyens de commutation dans un réseau de distribution d'énergie, p. ex. mise en ou hors circuit de consommateurs de courant par l'utilisation de signaux d'impulsion codés transmis par le réseau
G01R 21/133 - Dispositions pour procéder aux mesures de la puissance ou du facteur de puissance en utilisant des techniques numériques
H02J 3/00 - Circuits pour réseaux principaux ou de distribution, à courant alternatif
20.
Methods and systems for determining distribution grid hosting capacity
Methods and systems for determining a hosting capacity in a distribution grid are disclosed herein. The methods and systems may use optimization models that consider operating conditions of a distribution grid having a distinct topology, characteristics, and predetermined performance parameters. The determination of a hosting capacity may first consider a lossless power flow model for the distribution grid, which may then be used to arrive at a maximum hosting capacity for the distribution grid. The maximum hosting capacity may be defined as the total capacity of a number of distributed generators connected to the distribution grid such that the performance parameters will be met.
H02J 3/00 - Circuits pour réseaux principaux ou de distribution, à courant alternatif
H02J 3/38 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs
H02J 3/48 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs contrôlant la répartition de puissance entre les générateurs, convertisseurs ou transformateurs contrôlant la répartition de la composante en phase
H02J 3/50 - Dispositions pour l’alimentation en parallèle d’un seul réseau, par plusieurs générateurs, convertisseurs ou transformateurs contrôlant la répartition de puissance entre les générateurs, convertisseurs ou transformateurs contrôlant la répartition de la composante déphasée
21.
Methods and systems for determining economic viability of microgrid
Methods and systems for evaluating economic viability of a proposed microgrid, including uncertain variables are disclosed. One or more candidate distributed energy resources can be selected for use within a proposed microgrid. An investment cost and an operation cost of the one or more candidate distributed energy resources can be determined. A cost of drawing power from a main power grid can be compared to a sum of the investment cost and the operation cost of the one or more candidate distributed energy resources. The proposed microgrid can be identified for installation when the sum of the investment cost and the operation cost is less than the cost of drawing power from the main power grid.
G06Q 10/06 - Ressources, gestion de tâches, des ressources humaines ou de projetsPlanification d’entreprise ou d’organisationModélisation d’entreprise ou d’organisation