CCCC Harbour (Shanghai) Science & Technology Co., Ltd.

China

Back to Profile

1-3 of 3 for CCCC Harbour (Shanghai) Science & Technology Co., Ltd. Sort by
Query
Aggregations
Jurisdiction
        World 2
        United States 1
Date
2025 (YTD) 1
2024 1
2023 1
IPC Class
E02B 17/02 - Artificial islands mounted on piles or like supports, e.g. platforms on raisable legsConstruction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto 2
E02D 13/08 - Removing obstacles 2
E02D 7/00 - Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds 2
B28C 9/02 - General arrangement or layout of plant for producing mixtures of clay or cement with other materials 1
E02B 17/00 - Artificial islands mounted on piles or like supports, e.g. platforms on raisable legsConstruction methods therefor 1
See more
Found results for  patents

1.

Construction method for removing mud in jacket steel pipe pile

      
Application Number 18729184
Grant Number 12252857
Status In Force
Filing Date 2023-04-20
First Publication Date 2025-01-02
Grant Date 2025-03-18
Owner
  • CCCC SHANGHAI HARBOUR ENGINEERING DESIGN & RESEARCH INSTITUTE CO., LTD. (China)
  • CCCC HARBOUR (SHANGHAI) SCIENCE & TECHNOLOGY CO., LTD. (China)
  • CCCC SHANGHAI THIRD HARBOUR ENGINEERING SCIENCE & TECHNOLOGY RESEARCH INSTITUTE CO., LTD. (China)
  • CCCC THIRD HARBOR ENGINEERING CO., LTD. (China)
Inventor
  • Wang, Dongdong
  • Liu, Hui
  • Wang, Dapeng
  • Wu, Haibing
  • Lv, Dongliang
  • Sun, Xuan
  • Zhang, Heng

Abstract

A construction method for removing mud in a jacket steel pipe pile includes: erecting a piling auxiliary platform, and performing underwater steel pipe pile sinking; measuring an elevation of a mud surface in the underwater steel pipe pile, and calculating a height from the mud surface in the pile to a pile top and a needed mud removing depth according to the measurement result; installing mud removing equipment on the steel pipe pile; starting the mud removing equipment to carry out mud removing operation, and in a case that the mud removing depth is reached, pausing the mud removing equipment, and cleaning an inner wall of the steel pipe pile; and in a case that the mud removing operation is not reach the related elevation, repeating the mud removing operation till the mud removing operation reaches a standard.

IPC Classes  ?

  • E02D 13/08 - Removing obstacles
  • E02B 17/02 - Artificial islands mounted on piles or like supports, e.g. platforms on raisable legsConstruction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
  • E02D 7/00 - Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds

2.

CONSTRUCTION DEVICE IMPLEMENTING EX-SITU SOLIDIFICATION AND ANTI-SCOURING OF FLUIDIZED SOLIDIFIED SOIL IN OFFSHORE WIND POWER

      
Application Number CN2024082295
Publication Number 2024/230323
Status In Force
Filing Date 2024-03-18
Publication Date 2024-11-14
Owner
  • CCCC HARBOUR (SHANGHAI) SCIENCE & TECHNOLOGY CO., LTD. (China)
  • CCCC SHANGHAI HARBOUR ENGINEERING DESIGN & RESEARCH INSTITUTE CO., LTD. (China)
  • CCCC SHANGHAI THIRD HARBOUR ENGINEERING SCIENCE & TECHNOLOGY RESEARCH INSTITUTE CO., LTD. (China)
  • CCCC THIRD HARBOR ENGINEERING CO., LTD. (China)
Inventor
  • Tian, Zhi
  • Wang, Dapeng
  • Wang, Yansong
  • Chen, Xin
  • Zhang, Yueran
  • Zhang, Heng
  • Lv, Dongliang
  • Sun, Xuan
  • Zhang, Lianhu
  • Li, Cheng
  • Zhang, Jianyun

Abstract

The present application discloses a construction device implementing ex-situ solidification and anti-scouring of fluidized solidified soil in offshore wind power, comprising: a first stirring module, a feeding module, a second stirring module, an auxiliary material feeding module, and a transportation module. The feeding module is connected to the first stirring module and the second stirring module, the auxiliary material feeding module is connected to the second stirring module, and the transportation module is connected to the second stirring module. The present application can make the construction method continuous, standardized, efficient, etc., and effectively solves the problem that existing construction is rough; and by means of continuous stirring and continuous transportation, the field construction window period is shortened.

IPC Classes  ?

  • E02D 15/00 - Handling building or like materials for hydraulic engineering or foundations
  • E02D 31/06 - Protective arrangements for foundations or foundation structuresGround foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against corrosion by soil or water
  • B28C 9/02 - General arrangement or layout of plant for producing mixtures of clay or cement with other materials

3.

CONSTRUCTION METHOD FOR CLEANING MUD IN JACKET STEEL PIPE PILE

      
Application Number CN2023089552
Publication Number 2023/207754
Status In Force
Filing Date 2023-04-20
Publication Date 2023-11-02
Owner
  • CCCC SHANGHAI HARBOUR ENGINEERING DESIGN & RESEARCH INSTITUTE CO., LTD. (China)
  • CCCC HARBOUR (SHANGHAI) SCIENCE & TECHNOLOGY CO., LTD. (China)
  • CCCC SHANGHAI THIRD HARBOUR ENGINEERING SCIENCE & TECHNOLOGY RESEARCH INSTITUTE CO., LTD. (China)
Inventor
  • Wang, Dongdong
  • Liu, Hui
  • Wang, Dapeng
  • Wu, Haibing
  • Lv, Dongliang
  • Sun, Xuan
  • Zhang, Heng

Abstract

A construction method for cleaning mud in a jacket steel pipe pile, comprising: setting up a pile driving auxiliary platform (M1), and performing pile sinking of an underwater steel pipe pile (5); measuring the elevation of a mud surface in the underwater steel pipe pile (5), and calculating the height from the mud surface in the pile to the pile top and the depth required for mud cleaning according to the measurement result; mounting a mud cleaning device (M7) on the steel pipe pile (5); starting the mud cleaning device (M7) to perform a mud cleaning operation, and if the mud cleaning depth is reached, pausing the mud cleaning device (M7) and cleaning the inner wall of the steel pipe pile (5); and if the mud cleaning operation does not reach the designed elevation, repeating the mud cleaning operation until the mud cleaning operation reaches the elevation.

IPC Classes  ?

  • E02D 13/08 - Removing obstacles
  • E02D 27/44 - Foundations for machines, engines, or ordnance
  • E02D 27/42 - Foundations for poles, masts, or chimneys
  • E02D 7/00 - Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds
  • E02D 5/28 - Prefabricated piles made of steel
  • E02B 17/00 - Artificial islands mounted on piles or like supports, e.g. platforms on raisable legsConstruction methods therefor
  • E02B 17/02 - Artificial islands mounted on piles or like supports, e.g. platforms on raisable legsConstruction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto