Hydrochina Huadong Engineering Corporation Limited

China

Back to Profile

1-1 of 1 for Hydrochina Huadong Engineering Corporation Limited Sort by
Query
Aggregations
IPC Class
E02D 27/14 - Pile framings 1
E02D 27/16 - Foundations formed of separate piles 1
E02D 27/50 - Anchored foundations 1
E02D 31/00 - Protective arrangements for foundations or foundation structuresGround foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution 1
E02D 31/08 - Protective arrangements for foundations or foundation structuresGround foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil 1
See more
Found results for  patents

1.

Connection structure for blocking settlement of ground

      
Application Number 14641390
Grant Number 09366002
Status In Force
Filing Date 2015-03-08
First Publication Date 2015-10-22
Grant Date 2016-06-14
Owner HYDROCHINA HUADONG ENGINEERING CORPORATION LIMITED (China)
Inventor
  • Liu, Shiming
  • Xia, Shengtian

Abstract

The present invention discloses a connection structure for use in a building for blocking settlement of ground from being transmitted to either a pile foundation or a wall of the building. The connection structure comprises a weight-bearing column, a concrete pile foundation, and an engineering pile connected from top to bottom for bearing weight; the connection structure further comprises a reinforced concrete plate for use as the building's floor, a wall for the building and a ground beam beneath the wall.

IPC Classes  ?

  • E02D 27/50 - Anchored foundations
  • E02D 31/08 - Protective arrangements for foundations or foundation structuresGround foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against transmission of vibrations or movements in the foundation soil
  • E02D 27/14 - Pile framings
  • E02D 27/16 - Foundations formed of separate piles
  • E02D 31/00 - Protective arrangements for foundations or foundation structuresGround foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
  • E02D 37/00 - Repair of damaged foundations or foundation structures
  • E04B 1/38 - Connections for building structures in general
  • E04B 1/98 - Protection against other undesired influences or dangers against vibrations or shocksProtection against other undesired influences or dangers against mechanical destruction, e.g. by air-raids