The invention relates to a device (1) for launching a floating structure (2) or recovering the latter from the water, comprising at least one ramp (4) having a first end (4a), a second end (4b) opposite the first end (4a) and a device (6) for sliding the floating structure (2) along the ramp (4), the launch or recovery device (1) comprising a member (8) for pivoting the ramp (4), connected to this ramp at a point located between the first end (4a) and the second end (4b) of the ramp (4), and a motion-generating device (38) configured to cause the floating structure (2) to move on the ramp (4), the launch or recovery device (1) comprising at least one float (10) connected to one of the ends (4b) of the ramp (4) and at least one means (12) for controlling the buoyancy of the float (10).
The invention relates to a floating module (1) comprising a plurality of walls (2) extending between a first longitudinal end (4) and a second longitudinal end (6), the floating module (1) comprising a first partition (8) and a second partition (10) connecting each wall (2) of the plurality of walls, defining an internal volume (12) of the floating module (1), characterized in that the floating module (1) comprises at least one extension (14) emerging from an external face (16) of the wall (2), the extension (14) extending longitudinally in projection from the first longitudinal end (4) or from the second longitudinal end (6), the extension (14) and the wall (2) being materially integral. The invention also relates to a method for joining a first floating module (3) and a second floating module (5).
The present invention relates to a floating off-shore platform (1) configured for the offshore manufacture and/or assembly and/or maintenance and/or disassembly of floating wind turbines (2) comprising a floating foundation (4), a mast (6), a nacelle (8) and at least one blade (10), the platform (1) comprising at least one first zone (22) dedicated to the manufacture of the floating foundation (4) configured to receive the mast (6), and at least one second zone (24) dedicated to the assembly and/or disassembly of the floating foundation (4) and the mast (6), and a third zone (26) equipped with an at least partially submersible lifting platform, the platform (1) being composed of a plurality of monolithic floating caissons (16).
B63B 77/10 - Transporting or installing offshore structures on site using buoyancy forces, e.g. using semi-submersible barges, ballasting the structure or transporting of oil-and-gas platforms specially adapted for electric power plants, e.g. wind turbines or tidal turbine generators
The invention relates to a floating module (1) comprising a plurality of walls (2) extending between a first longitudinal end (4) and a second longitudinal end (6), the floating module (1) comprising a first partition (8) and a second partition (10) connecting each wall (2) of the plurality of walls, defining an internal volume (12) of the floating module (1), characterized in that the floating module (1) comprises at least one extension (14) emerging from an external face (16) of the wall (2), the extension (14) extending longitudinally in projection from the first longitudinal end (4) or from the second longitudinal end (6), the extension (14) and the wall (2) being materially integral. The invention also relates to a method for joining a first floating module (3) and a second floating module (5).
The invention relates to a floating module (1) comprising a plurality of walls (2) extending between a first longitudinal end (4) and a second longitudinal end (6), the floating module (1) comprising a first partition (8) and a second partition (10) connecting each wall (2) of the plurality of walls, defining an internal volume (12) of the floating module (1), characterized in that the floating module (1) comprises at least one extension (14) emerging from an external face (16) of the wall (2), the extension (14) extending longitudinally in projection from the first longitudinal end (4) or from the second longitudinal end (6), the extension (14) and the wall (2) being materially integral. The invention also relates to a method for joining a first floating module (3) and a second floating module (5).