Alderon Industries, LLC

United States of America

Back to Profile

1-2 of 2 for Alderon Industries, LLC Sort by
Query
Aggregations
Date
2025 (YTD) 1
2022 1
IPC Class
E03F 11/00 - Cesspools 1
E03F 5/18 - Tanks for disinfecting, neutralising, or cooling sewage 1
E03F 5/22 - Adaptations of pumping plants for lifting sewage 1
F04D 15/00 - Control, e.g. regulation, of pumps, pumping installations, or systems 1
F04D 15/02 - Stopping of pumps, or operating valves, on occurrence of unwanted conditions 1
See more
Status
Pending 1
Registered / In Force 1
Found results for  patents

1.

METHOD OF MANUFACTURING FLOAT SWITCH

      
Application Number 18933719
Status Pending
Filing Date 2024-10-31
First Publication Date 2025-07-31
Owner Alderon Industries, LLC (USA)
Inventor Guetter, Alexander Richard

Abstract

A method of manufacturing a float switch assembly for use in actuating a switch to operate a pump to control the level of a fluid in a tank. A method of manufacturing a float switch may include placing two halves of a float switch housing such that contact is made along a relatively flat surface area of the two halves, and moving the two halves in a vibratory manner relative to each other in a direction generally parallel to the relatively flat surface area.

IPC Classes  ?

  • H01H 11/00 - Apparatus or processes specially adapted for the manufacture of electric switches
  • H01H 9/04 - Dustproof, splashproof, drip-proof, waterproof, or flameproof casings
  • H01H 35/18 - Switches operated by change of liquid level or of liquid density, e.g. float switch

2.

Septic system including control and monitoring system

      
Application Number 17677504
Grant Number 12378758
Status In Force
Filing Date 2022-02-22
First Publication Date 2022-08-25
Grant Date 2025-08-05
Owner ALDERON INDUSTRIES, LLC (USA)
Inventor Klabunde, Robert Gordon

Abstract

A method of operating a septic system to facilitate maintenance and avoid damage to property and/or the environment. A septic system that collects and monitors data to provide information to a user about the nature of a problem condition, or to warn a user of potential problems in advance, or to recommend courses of action to avoid costly repairs, or property damage, or damage to the environment.

IPC Classes  ?

  • E03F 5/22 - Adaptations of pumping plants for lifting sewage
  • E03F 5/18 - Tanks for disinfecting, neutralising, or cooling sewage
  • E03F 11/00 - Cesspools
  • F04D 15/00 - Control, e.g. regulation, of pumps, pumping installations, or systems
  • F04D 15/02 - Stopping of pumps, or operating valves, on occurrence of unwanted conditions