MATIS Material Industrial SA

Switzerland

Back to Profile

1-1 of 1 for MATIS Material Industrial SA Sort by
Query
Aggregations
IPC Class
E01B 27/10 - Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up the track 1
E01B 27/11 - Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components 1
E01B 29/09 - Transporting, laying, removing, or renewing sleepers under, or from under, installed rails 1
E01B 29/10 - Transporting, laying, removing, or renewing sleepers under, or from under, installed rails for inserting or removing sleepers 1
Found results for  patents

1.

Machine for renewal of sleepers and ballast under raised railway track

      
Application Number 14911803
Grant Number 09945079
Status In Force
Filing Date 2014-07-31
First Publication Date 2016-07-07
Grant Date 2018-04-17
Owner
  • MATIS Material Industrial SA (Switzerland)
  • Joerg Ganz (Switzerland)
Inventor Ganz, Joerg

Abstract

A machine for the renewal of sleepers of a track having rails and for the cleaning of exposed ballast after removal of old sleepers, includes a machine frame which is movable on a rail bogie on the track, a screening plant and a clearing device having a collection device for collecting ballast. A sleeper transport device includes a sleeper gripper, rotatable about a vertical axis, between two end-positioned rail bogies, connected to the machine frame, and being displaceable in a longitudinal direction of the machine. The sleeper transport device is displaceable from a front end position (with respect to a working direction) provided for picking up new sleepers by the collection device for collecting ballast, to a rear end position configured to deposit the new sleepers.

IPC Classes  ?

  • E01B 29/10 - Transporting, laying, removing, or renewing sleepers under, or from under, installed rails for inserting or removing sleepers
  • E01B 27/10 - Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up the track
  • E01B 27/11 - Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components
  • E01B 29/09 - Transporting, laying, removing, or renewing sleepers under, or from under, installed rails