PPI Engineering & Construction Services, LLC

United States of America

Back to Profile

1-6 of 6 for PPI Engineering & Construction Services, LLC Sort by
Query
Aggregations
IP Type
        Patent 3
        Trademark 3
Jurisdiction
        United States 5
        World 1
Date
2022 1
2020 1
Before 2020 4
IPC Class
E02D 3/08 - Improving by compacting by inserting stones or lost bodies, e.g. compaction piles 2
E02D 5/34 - Concrete or concrete-like piles cast in position 2
E02D 5/36 - Concrete or concrete-like piles cast in position making without use of mould-pipes or other moulds 2
E02D 5/48 - Piles varying in construction along their length 2
E02D 27/12 - Pile foundations 1
See more
NICE Class
37 - Construction and mining; installation and repair services 3
42 - Scientific, technological and industrial services, research and design 1
Status
Pending 1
Registered / In Force 5

1.

COMPACT-R

      
Serial Number 97427466
Status Pending
Filing Date 2022-05-25
Owner PPI Engineering & Construction Services, LLC ()
NICE Classes  ? 37 - Construction and mining; installation and repair services

Goods & Services

Construction of civil engineering structures, namely, aggregate pier installations

2.

SPOILFREE

      
Serial Number 88881398
Status Registered
Filing Date 2020-04-21
Registration Date 2022-01-18
Owner PPI Engineering & Construction Services,LLC ()
NICE Classes  ? 37 - Construction and mining; installation and repair services

Goods & Services

Construction of civil engineering structures, namely, intermediate foundation installations

3.

Pier tool and method of use

      
Application Number 16047480
Grant Number 10640944
Status In Force
Filing Date 2018-07-27
First Publication Date 2019-01-31
Grant Date 2020-05-05
Owner PPI ENGINEERING & CONSTRUCTION SERVICES, LLC (USA)
Inventor
  • Thomas, Ronald D.
  • Williamson, Tommy L.

Abstract

A pier tool, includes: a tubular body having an uphole end and a downhole end and defining a flow path therethrough and a tamping head disposed within the flow path of the tubular body and defines tamping surface on a downhole side of the tamping head A method for forming a pier includes assembling a pier tool mandrel, a pier tool mandrel including the pier tool and forming a rammed aggregate pier using the pier tool mandrel.

IPC Classes  ?

  • E02D 3/08 - Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
  • E02D 5/36 - Concrete or concrete-like piles cast in position making without use of mould-pipes or other moulds
  • E02D 7/18 - Placing by vibrating
  • E02D 7/06 - Power-driven drivers
  • E02D 5/44 - Concrete or concrete-like piles cast in position making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile

4.

COMBINATION PIER

      
Application Number US2017060745
Publication Number 2018/231274
Status In Force
Filing Date 2017-11-09
Publication Date 2018-12-20
Owner
  • PPI ENGINEERING & CONSTRUCTION SERVICES, LLC (USA)
  • WILLIAMSON, Thomas L. (USA)
Inventor Thomas, Ronald D.

Abstract

A combination pier includes: a pile disposed in a bore hole from the bottom of the bore hole to a desired depth; and a pier disposed in the bore hole from the desired depth to the surface. A method for constructing a combination pier includes: forming a pile in a bore hole from the bottom of the bore hole to a desired depth; and forming a pier from the desired depth to the surface.

IPC Classes  ?

  • E02D 5/48 - Piles varying in construction along their length
  • E02D 5/34 - Concrete or concrete-like piles cast in position

5.

Combination pier

      
Application Number 15810203
Grant Number 10822762
Status In Force
Filing Date 2017-11-13
First Publication Date 2018-12-13
Grant Date 2020-11-03
Owner PPI ENGINEERING & CONSTRUCTION SERVICES, LLC (USA)
Inventor
  • Thomas, Ronald D.
  • Williamson, Tommy L.

Abstract

A combination pier includes: a pile disposed in a bore hole from the bottom of the bore hole to a desired depth; and a pier disposed in the bore hole from the desired depth to the surface. A method for constructing a combination pier includes: forming a pile in a bore hole from the bottom of the bore hole to a desired depth; and forming a pier from the desired depth to the surface.

IPC Classes  ?

  • E02D 3/08 - Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
  • E02D 5/34 - Concrete or concrete-like piles cast in position
  • E02D 5/48 - Piles varying in construction along their length
  • E02D 27/12 - Pile foundations
  • E02D 7/00 - Methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds
  • E02D 5/36 - Concrete or concrete-like piles cast in position making without use of mould-pipes or other moulds
  • E02D 31/00 - Protective arrangements for foundations or foundation structuresGround foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution

6.

COMBOPIER

      
Serial Number 87572813
Status Registered
Filing Date 2017-08-17
Registration Date 2018-10-02
Owner PPI Engineering & Construction Services, LLC ()
NICE Classes  ?
  • 37 - Construction and mining; installation and repair services
  • 42 - Scientific, technological and industrial services, research and design

Goods & Services

Installation of customized building foundation support structures; Retrofitting and repair of foundations Custom design of residential and commercial building foundation support structures